top of page

Ceecorp

synnex warehouse lidcombe

Ceecorp was contracted to undertake excavation works at the former Ford manufacturing plant in Lidcombe.  The 20,000sqm site was being developed into a whole of site warehouse and distribution facility for Synnex.

 

The works involved:

  • Creating building platforms for the 6,400sqm building slab

  • Excavating foundations for warehouse buildings

  • Constructing subsoil drainage for long term pavement stability

  • Compacting, lime stabilisation, laser levelling and preparation for external pavements including footpaths, driveways and carparks

  • Excavating and backfilling flood management and stormwater detention tanks