Ceecorp
synnex warehouse lidcombe
Ceecorp was contracted to undertake excavation works at the former Ford manufacturing plant in Lidcombe. The 20,000sqm site was being developed into a whole of site warehouse and distribution facility for Synnex.
The works involved:
-
Creating building platforms for the 6,400sqm building slab
-
Excavating foundations for warehouse buildings
-
Constructing subsoil drainage for long term pavement stability
-
Compacting, lime stabilisation, laser levelling and preparation for external pavements including footpaths, driveways and carparks
-
Excavating and backfilling flood management and stormwater detention tanks